Home 2.0 Blog Archive

Friday, June 19, 2015

BATH TIME

Bath Tub Installed as Plumbing Work Progresses

As plumbing rough-ins have continued to move forward, one of the recently completed items was the installation of the hallway bathtub on the second floor. Sequentially, tubs need to be installed before sheathing is hung, so they are set long before sinks, toilets, and other plumbing fixtures. Other plumbing tasks completed, were the stubbing in of the hot and cold supply lines for each fixture, and installing the hose bib at the rear of the house.