Home 2.0 Blog Archive

Friday, July 24, 2015

PATIO STAIR

Rear Landing Framing

On Thursday the framers were back on site setting the rear posts and building out the landing at the back entry door leading down to the patio. The first and most labor intensive step for the two man crew was digging down the 30"+ required to get below the frost line with nothing more than a hand spade, which was a pretty impressive feat to see in person. Here are some pictures of the rear patio stair progress after a day's work.