Tile Work Underway
Monday the tile work on the Starter Home 2.0 Project began with the installation of cementitious backer board on the bathroom floor and wall surfaces where the tile is being applied. The master shower base was built up and prepped for tile work with the waterproofing membrane put into place and the first of the 12 x 24 porcelain floor tiles were set using spacers for the grout joints.