GAS UP & DRIVE

Gas Meter & Driveway Extension

On Tuesday the gas meter was hooked-up to the home and a second section of the driveway was poured along the side of the house. I also met with my builder to discuss the logistics of adding in a landscape wall around a portion of the front yard where the concrete steps to the driveway will be poured, which will make the yard more usable, give the lot some additional curb appeal, and prevent the steps from sliding down the hill over time. Below are images of the work completed along with a sketch of the proposed landscape wall.