Home 2.0 Blog Archive

Tuesday, September 29, 2015

STEPPING UP

Front Porch Steps Underway

On Monday the porch steps were constructed, effectively completing the circulation path from the driveway up to the front entry. The width of the steps had to be narrowed up slightly from the original design to coordinate with the extents of the poured concrete landing, so it will be interesting to see what it looks like once the stringer trim and railing installation is complete.