NEW PROJECT, NEW CHALLENGES

SH2.0 OAKLEY ADJUSTMENTS

While the Starter Home 2.0 Pleasant Ridge project was a critical first step in my Architect as Developer career, the second SH2.0 project is presenting me with a whole new set of challenges that need to be addressed, most of which, are a result of me planning to sell (or rent), the Oakley project, rather than live in it. I'm currently in the process of working through each of these items, so I'll follow-up with more detailed blog posts as they get resolved, but in short, these new challenges include modifications to the following:
  • Project Financing
  • Business Structure (creating an LLC to own the project)
  • Insurance
  • Contracts