Home 2.0 Blog Archive

Thursday, June 1, 2017

GRAVEL ARRIVAL

Drain Pipe Layout Underway

Yesterday marked the arrival of the first load of gravel on site, which was placed alongside the footers and over the drain pipe set in place around the front perimeter of the home. A couple pics from the scene below and many more posted on the Google Photo Album.