Driveway Finish Grading Underway
On Tuesday the mini excavator was back on site to start the finish grading work at the front of the house to allow for the driveway up to the garage to be prepped with gravel and poured in upcoming days. Below are some pictures taken during my daily visit to the Oakley Home 2.0 property.