Mailbox, Street Number & Lighting Adjustments
On Friday the Mailbox and Street Address Numbers were mounted on the walls of the front porch, which leaves only the painting of the garage door and porch/deck trim along with the seeding/sodding and landscaping as the only exterior related building items needing to be completed (both of which are weather dependent).I also changed out the front porch ceiling light that was previously a CFL with an indoor/outdoor LED flood light, and the reading nook pendant light with a lower wattage LED light so that it is the appropriate brightness for reading. Images of these items are shown below.