Home 2.0 Blog Archive

Sunday, April 12, 2015

INSPECTIONS LOG

Cagis ezTrak Inspections

Similar to the way Cagis ezTrak allows for the online tracking of permit approvals for projects, it also allows for the online tracking of the various inspections required throughout construction. Here are a couple different links to where the Starter Home 2.0 Inspections are currently being tracked (Link 1 | Link 2). The inspection log will ultimately include (but not be limited to) the following:
  • Soil Inspection
  • Foundation Anchors
  • Damproofing/water proofing
  • Framing Inspection
  • Rough-In Inspection
  • Erosion Control in Place
  • Firestoping Inspection
  • Insulation Inspection
  • Final Plumbing Inspection
  • Final HVAC Inspection
  • MSD C of O Sign-off
  • CWW C of O Sign-off
  • Final Permit Inspection
  • Mech Permit Supvsr Apprvl
  • Supervisor Approval