Home 2.0 Blog Archive

Tuesday, May 5, 2015

2ND FLOOR FRAMING

Perimeter Stud Walls Up

On Monday the framing crew was able to get the remaining exterior walls on the second floor framed and lifted into place so that the roof trusses can get set on Tuesday. I wasn't able to get up on the second floor to take pictures from that level, but I did get some nice images taken from street level and looking up from inside the first floor. I also got down in the basement for the first time and included some shots of that area.