Monday, June 22, 2015

INSULATION INSTALLATION

Walls Insulated, Stopped & Sealed 

With plumbing, HVAC, and electrical rough-ins significantly complete on the Starter Home 2.0 project. The insulation crew was able to go around the perimeter of the house and seal all joints and gaps in the exterior framing, install R-19 insulation batts in between all the 2x6 studs, and firestop all pipe, duct, and wire penetrations. This work was completed throughout the first floor and the majority of the second floor, and should be wrapping up in the next few days.