Saturday, September 26, 2015

CONCRETE & SIDING WRAP-UP

Concrete Drive & Steps, Siding & Trim Work

Friday, the concrete driveway and steps were prepped with a base layer of gravel and form work, and poured in place from the street, up to the base of the porch steps. The siding crew was also back on site and finished installing the porch ceiling soffit and trimming out the opening around the garage door.