Material and Patio Refinements

This past weekend I started the process of setting up sheets for the Starter Home 2.0 Oakley construction documents and experimenting with material finishes for the exterior. I've also been working through the patio design over the garage for aesthetics and constructability. Below is a progress rendering of the front elevation along with a basis-of-design for the rooftop patio detail, which is something that I pulled from this Build LLC Blog entry.