Monday, July 24, 2017

2ND FLOOR VIDEO TOUR

Framing and Plumbing Rough-in Walkthrough

Over the weekend, the plumbing contractor was back on site for the first time since the underslab rough-ins to begin installing the drain, waste and vent lines along with some supply lines to and from the various fixtures on the first and second floor. Below are some photos of the progress as well as a walkthrough video touring the current state of the 2nd floor.