Saturday, August 26, 2017

MORE VOIDS FILLED

Interior Garage Wall Separation

Insulation work continued on Friday with rigid insulation being cut to fill the voids between the joists above the wall separating the garage from the first floor hallway. Once the rigid was placed, foam sealant was sprayed around the perimeter to ensure a complete seal of the cavity. Images of the finished result and materials utilized are shown below.